September 8, 2026 · 34/2026
Geotechnical study of RR 116 alignment correction at Msalit dam, Tata Province
Geotechnical study of RR 116 alignment correction at Msalit dam, Tata Province — published by Provincial Director of Equipment, Transport, Logistics and Water of Tata in Tata. The published budget is 52 650 DHS. Bids closed on September 8, 2026. No result has been published for it yet.
- Buyer
- Provincial Director of Equipment, Transport, Logistics and Water of Tata
- Category
- Services
- Sector
- Engineering studies
- Location
- Tata
- Reference
- 34/2026
- Published
- August 12, 2026
- Closing
- September 8, 2026
- Published budget
- 52 650 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Published by
Provincial Director of Equipment, Transport, Logistics and Water of Tata
See this buyer →What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Souss-Massa
- Services
- Engineering studies