Awarded
June 11, 2026 · 17/2026/DRPE
Etude impact environnemental et rentabilité barrage Bousbaa
Etude impact environnemental et rentabilité barrage Bousbaa — published by Director of Water Research and Planning in Larache, Ouezzane. The published budget is 1 920 000 DHS. Bids closed on June 11, 2026. The contract was awarded to NOVEC.
- Buyer
- Director of Water Research and Planning
- Category
- Services
- Sector
- Engineering studies
- Location
- Larache, Ouezzane
- Reference
- 17/2026/DRPE
- Published
- May 14, 2026
- Closing
- June 11, 2026
- Published budget
- 1 920 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Tangier-Tetouan-Al Hoceima
- Services
- Engineering studies