Open
Closes in 8 days · 37/2026/BP
Construction of a track linking road RP2007 and Douar El Barja (4.2 km) — Aït Imour, Marrakech
Construction of a track linking road RP2007 and Douar El Barja (4.2 km) — Aït Imour, Marrakech — published by Prefecture of Marrakech in Marrakech. The published budget is 5 418 760 DHS. Bids close on September 15, 2026. When the buyer announces a result, it appears on this page.
- Buyer
- Prefecture of Marrakech
- Category
- Works
- Sector
- Road, Path and Track Works
- Location
- Marrakech
- Reference
- 37/2026/BP
- Published
- July 27, 2026
- Closing
- September 15, 2026
- Published budget
- 5 418 760 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Bids close in
8 days
September 15, 2026
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Works
- Road, Path and Track Works